中文

Stock Code: 000008(CHSR)

Home Core Products
HGCY06-ⅡModel Rail Replacement Device GZH-70 Steel Rail Post Weld Heat Treatment Complete Equipment GFJZ-50 Steel Rail Full Cross Section Milling Machining Center GFJX-100 Steel Rail Welding Joint CNC Milling Machine Tool Overload / Unbalanced Load Detection Device Computer Interlocking System EMU Shunting Safety Monitoring System (Position Tracking) Running Preparation Comprehensive Information Management System Test and Monitoring System of Contact Line Hanging (4C) On-Board Test System of Contact Line Operation Conditions (3C) Rain Running Fault 3D Image Detecting System Wheel Malfunction Online Detection System Rolling Stock Wash Plant Maglev train maintenance system integration Wheel Set Dimension Measuring Machine System Integration of EMU Wheel Axle and Wheel Set Maintenance Line EMU Bogie Static Load Test Stand EMU Bogie Dynamic Load Test Stand EMU Oil Monitoring System Mobile Hollow Shaft Ultrasonic Detector (SUN-I Model) Fixed Hollow Shaft Ultrasonic Detecting Machine EMU Online Mobile Wheel Rim & Wheel Spoke Detection System (Model SU-1) EMU Bogie Maintenance Line System Integration Dispatch Emergency Command System Multi-channel big data wireless transmission system Power supply system BIM platform Data Repair System Intelligent Permanent Way Disaster Detecting System Double track ultrasonic flaw detection vehicle Locomotive online mobile rim spoke ultrasonic flaw detector EMU online mobile rim spoke ultrasonic flaw detector Intelligent Inspection Robot on vehicle’s roof Intelligent Inspection Robot on vehicle’s bottom

EMU Bogie Maintenance Line System Integration

  This system integration is made up of bogie disassembly, frame maintenance, bogie assembly test and other units. It mainly includes bogie parts disassembly, cleaning, inspecting, frame components disassembly, paint stripping, magnetic particle detection, paint drying, frame overturning, inspection & measurement, components assembly, bogie frame and wheel set assembly, motor assembly, primary suspension assembly, static pressure test, air tightness test and electrical comprehensive test, and etc.

The work pieces are using online automatic transmission. While the bogie disassembly maintenance management control system performs the unified management on the maintenance line to achieve the information exchange between equipment.

The inspection information will be sent to bogie disassembly maintenance management control system which is responsible for instructing the maintenance of each station.

This system integration forms unified overall maintenance line design mode by adopting streamlined production mode, control, logistics, equipment, stations and tooling. All the station equipment are connected organically and flexibly to ensure reliable system performance, satisfying functions, swift automatic logistics, safe & flexible procedures and convenient maintenance & operation, as well as to ensure the smooth procedure flow, logistics flow and information flow.

Copyright© Cathay High-Speed Railway Technology Co., Ltd.

Legal Disclaimer Privacy Sitemap