Kunming Rail Transit Line 6 Phase I Project:
Kunming Rail Transit Line 6 Phase I project runs from east passenger station to air harbor south station with a total length of 18.018 km. Dabanqiao rolling stock depot has been provided and its main functions are 1) rolling stock berthing and daily maintenance; 2) rolling stock maintenance; 3) locomotive rescue; 4) comprehensive maintenance; 5) material supply; 6) control center. CHSR has undertaken equipment supply, integration, and installation of Dabanqiao rolling stock depot and comprehensive base. The scope of integration covers cranes, passenger and freight lift, slide contact, purging equipment, 3-layer operation platform (steel structure maintenance platform), restricted area gate infrastructure and etc.